Repository Universitas Andalas

ANALISIS ALOKASI BIAYA UNTUK PENGURANGAN RISIKO KESEHATAN DAN KESELAMATAN KERJA DENGAN SIMULASI MONTE CARLO DI PROYEK FUEL GAS CONVERTION PEMBANGKIT MUARA TAWAR BEKASI (STUDI KASUS DI PT. ALSTOM POWER ENERGY SYSTEM INDONESIA)

Meuthia, Yumi (2009) ANALISIS ALOKASI BIAYA UNTUK PENGURANGAN RISIKO KESEHATAN DAN KESELAMATAN KERJA DENGAN SIMULASI MONTE CARLO DI PROYEK FUEL GAS CONVERTION PEMBANGKIT MUARA TAWAR BEKASI (STUDI KASUS DI PT. ALSTOM POWER ENERGY SYSTEM INDONESIA). ANALISIS ALOKASI BIAYA UNTUK PENGURANGAN RISIKO KESEHATAN DAN KESELAMATAN KERJA DENGAN SIMULASI MONTE CARLO DI PROYEK FUEL GAS CONVERTION PEMBANGKIT MUARA TAWAR BEKASI (STUDI KASUS DI PT. ALSTOM POWER ENERGY SYSTEM INDONESIA), 8 (2). ISSN 1412-4769

[img] Microsoft Word (ANALISIS ALOKASI BIAYA UNTUK PENGURANGAN RISIKO KESEHATAN DAN KESELAMATAN KERJA DENGAN SIMULASI MONTE CARLO DI PROYEK FUEL GAS CONVERTION PEMBANGKIT MUARA TAWAR BEKASI (STUDI KASUS DI PT. ALSTOM POWER ENERGY SYSTEM INDONESIA)) - Published Version
Available under License Creative Commons Public Domain Dedication.

Download (121Kb)

Abstract

Health and safety is a major concern that has to be considered seriously by all Alstom Power Energy System Indonesia employees whether its permanent staff or contractor. This study consists of two parts. The first part analyze factors that affect health & safety. The results of this study show that factors which have high level risk are fire and explosion at project site. The second part analyze risk priority level of 7 type of works in Fuel Gas Convertion Project at Muara Tawar, with treatment cost and risk cost provided. Moreover, this study focus to 5 type of works that have high level risk and using Monte Carlo simulation and Optquest by Cristal Ball to analyze the dynamic of cost allocation and total advantage. The results of the study show that the more available budget is spent, the more total advantage is acquired, and the more type of works can be treated. But after budget limitation of 95% increasing of total advantage is not as significant as the increasing amount of budget spent in treatment. Keywords: Risk Management, Health and Safety Management

Item Type: Article
Subjects: T Technology > T Technology (General)
Unit atau Lembaga: Fakultas Teknik > Teknik Industri
Depositing User: SSi Resta Yanda
Date Deposited: 24 May 2010 08:15
Last Modified: 24 May 2010 08:15
URI: http://repository.unand.ac.id/id/eprint/694

Actions (login required)

View Item View Item