Repository Universitas Andalas

Execution Planning of North District Highway Construction Padang Sawah - Simpang Empat Section (STA 170+000 to STA 175+100) West Pasaman Regency West Sumatera Province

Putri, Dewi Novita and Gusnita, Riza (2008) Execution Planning of North District Highway Construction Padang Sawah - Simpang Empat Section (STA 170+000 to STA 175+100) West Pasaman Regency West Sumatera Province. Other thesis, Politeknik Universitas Andalas.

[img]
Preview
PDF (Execution Planning of North District Highway Construction Padang Sawah - Simpang Empat Section (STA 170+000 to STA 175+100) West Pasaman Regency West Sumatera Province) - Supplemental Material
Available under License Creative Commons Public Domain Dedication.

Download (378Kb) | Preview

Abstract

Road as infrastructure is one of economy growth support, we can see how very bigness the disadvantages or negative effect of non-durable material, for example agriculture commodity, if distribute by road infrastructure with bad condition and have long distributing time, it can make the high cost and low competitiveness influence for that commodity. So that, it needs effective way in executing the road project construction to achieve a good result, and give the comfortable for any parties that using the road. Therefore, the road from Padang Sawah to Simpang Empat in the West Pasaman with the length of road is 5,100 Km, should be widening and overlay, so that, the first way is planning for executing the road project by arranging the final project. In executing the road construction, the Cost Estimating is just about Rp. 12.830.711.000,00 (count: Twelve Billion Eight Hundred Thirty Million Seven Hundred Eleven Thousand Rupiah) with the duration for executing the road project is 128 days. The organizational structure and controlling (qualtty control, time control and cost control) are important things in achieving the successful project execution. The specific evaluation is flexible pavement design for the sub base course, base course and surface in North District Highway Padang Sawah - Simpang Empat Section by using Bina Marga Method, the result is differ from the real road construction design because of some assumption data in designing the specific evaluation.

Item Type: Thesis (Other)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Unit atau Lembaga: UNSPECIFIED
Depositing User: Haryoshi Utami
Date Deposited: 18 Apr 2011 12:28
Last Modified: 11 Oct 2011 02:46
URI: http://repository.unand.ac.id/id/eprint/11246

Actions (login required)

View Item View Item